Low-cost geotech tool
Measures up to 100°C
30m or 50m lengths
Hot hole dip suitability
0.5m increment marks
Durable and accurate
Developed by MTi GROUP in the same configuration as the MiTiMEASURE, the thermometer is durable and low cost compared with geotechnical instrumentation. The product consists of 30m of K type thermocouple which is marked in graduations of 0.5m. Used for measuring borehole temperature, the thermometer hot hole dipping tape is great for QA checks on blast holes before loading.
Terms & Conditions

Case Studies
View all-
Reduce Ore Loss & Dilution in Mining
Discover how a major South American copper mine cut ore loss by 36.6% and saved over $42,000 using MTi’s BLASTBAG™ technology.
Reduce Ore Loss & Dilution in Mining
Discover how a major South American copper mine cut ore loss by 36.6% and saved over $42,000 using MTi’s BLASTBAG™ technology.
-
Flyrock Reduction in Surface Blasting
BLASTBAG™ air decking cut flyrock incidents to near zero and reduced charge per hole by 33 lbs, enabling safer blasting at a West African gold mine.
Flyrock Reduction in Surface Blasting
BLASTBAG™ air decking cut flyrock incidents to near zero and reduced charge per hole by 33 lbs, enabling safer blasting at a West African gold mine.
-
Solving Hard Digging
MTi’s BLASTBAG™ cut dig times by 21% and reduced costs by 8% at a South Kalimantan mine.
Solving Hard Digging
MTi’s BLASTBAG™ cut dig times by 21% and reduced costs by 8% at a South Kalimantan mine.
Learn
View all-
Pre‑Split Blasting: What It Is & Why It Matters
Pre-split blasting uses a tight row of light charges to protect your final wall, reduce overbreak, and leave a cleaner, safer face.
Pre‑Split Blasting: What It Is & Why It Matters
Pre-split blasting uses a tight row of light charges to protect your final wall, reduce overbreak, and leave a cleaner, safer face.
-
7 Clues You’re Using the Wrong Stemming Plugs
A lot of blast issues trace back to one small part—the stemming plug. Here are 7 clues yours might be failing and costing you performance.
7 Clues You’re Using the Wrong Stemming Plugs
A lot of blast issues trace back to one small part—the stemming plug. Here are 7 clues yours might be failing and costing you performance.
-
5 Hidden Costs of Lost Energy
Lost blast energy leads to bigger rock, slower mucking, more wear, and higher cost per ton. Here are five hidden costs every blaster should know.
5 Hidden Costs of Lost Energy
Lost blast energy leads to bigger rock, slower mucking, more wear, and higher cost per ton. Here are five hidden costs every blaster should know.
Subscribe to our emails
Be the first to know about new collections and exclusive offers.