Iron ore · South America · Open Pit
Iron oreSouth AmericaOpen PitROCKRIVET™

38% Finer Fragmentation. 15% Less Oversize. Here's How.

A 90-million-tonne-a-year iron ore mine used ROCKRIVETS to improve stemming confinement — craters up to 40–75% larger, P80 down 38%, and top-size down 15%.

4 min read Feb 23, 2026 Ryan Singleton
38% Finer Fragmentation. 15% Less Oversize. Here's How.
38% reduction in P80 Project Highlights
  • 38% reduction in P80
  • Reduced top-size material by 15%
  • Decreased flyrock and reduced flyrock range
Site Profile
Location South America
Site Type Open Pit
Material Iron ore
Bench Height 16.0m
Burden & Spacing 5.0 x 6.0m
Hole Diameter 250mm
Explosive ANFO and IBENITE (70/30)
Product ROCKRIVET™
Run a trial

Get these results on your bench.

Tell us about your operation — bench height, hole diameter, current powder factor. We'll ship samples, send a blaster to your site, or build a custom trial plan with your D&B team.

Same-week response
No charge for samples
Field engineer on call
Or call sales — (606) 663-4069 • Stanton, KY warehouse