Copper · Chile · Open Pit
CopperChileOpen PitBLASTBAG™ AERO

Optimizing Trim Blasting

A large open-cut copper mine in Chile scored 97% and 91% on wall design across two air-decked trim trials — both at or above the 70% success criteria — with no visible cracking after the dig.

5 min read Jun 5, 2026 MTi USA
Optimizing Trim Blasting
Project Highlights
  • Conditioning Factor: 70% (Trial 1), 73% (Trial 2) — both met the 70% criteria
  • Design Factor: 97% (Trial 1), 91% (Trial 2) — both exceeded the 70% criteria
  • No visible cracking or damage after excavation
Site Profile
Location Chile
Site Type Open Pit
Material Copper
Bench Height 15.0m
Hole Diameter 311mm
Product BLASTBAG™ AERO
Run a trial

Get these results on your bench.

Tell us about your operation — bench height, hole diameter, current powder factor. We'll ship samples, send a blaster to your site, or build a custom trial plan with your D&B team.

Same-week response
No charge for samples
Field engineer on call
Or call sales — (606) 663-4069 • Stanton, KY warehouse