Copper · South America · Open Pit
CopperSouth AmericaOpen PitBLASTBAG™ SOLO

Preserving Pitwalls with Airdecking

A large South American copper mine reduced final-wall damage by adding air decks in the buffer rows — confirmed by borehole-camera fracture counts.

5 min read Jun 5, 2026 MTi USA
Preserving Pitwalls with Airdecking
Project Highlights
  • Reduced near-field damage to final pit walls
  • Air decks deployed across 800+ holes
  • Fracturing intensity decreased in the air-decked test
Site Profile
Location South America
Site Type Open Pit
Material Copper
Bench Height 10m
Burden & Spacing 4.0 x 4.5m
Hole Diameter 171mm
Explosive Emusion
Product BLASTBAG™ SOLO
Run a trial

Get these results on your bench.

Tell us about your operation — bench height, hole diameter, current powder factor. We'll ship samples, send a blaster to your site, or build a custom trial plan with your D&B team.

Same-week response
No charge for samples
Field engineer on call
Or call sales — (606) 663-4069 • Stanton, KY warehouse