Project Highlights
  • 8% reduction in P80 and 21% reduction in XMAX (POC blasts)
  • Dig rates 16% below the current practice benchmark
  • 8% reduction in drill and blast costs
Site Profile
Location Indonesia
Site Type Open Pit
Material Coal
Bench Height 6.0m
Burden & Spacing 7.0 x 7.0m
Hole Diameter 171mm
Explosive ANFO
Product BLASTBAG™ AERO
Run a trial

Get these results on your bench.

Tell us about your operation — bench height, hole diameter, current powder factor. We'll ship samples, send a blaster to your site, or build a custom trial plan with your D&B team.

Same-week response
No charge for samples
Field engineer on call
Or call sales — (606) 663-4069 • Stanton, KY warehouse