Gold · Ghana · Underground
GoldGhanaUndergroundBLASTSHIELD™ PLUS

How an Underground Gold Mine Stopped Losing Emulsion to Groundwater | MTi GROUP

An underground gold mine in Ghana stopped losing emulsion to groundwater — zero slumping, every uphole charged in a single pass — by combining the BLASTSHIELD™ liner with a BLASTBAG™ AERO.

4 min read Mar 30, 2026 Ryan Singleton
How an Underground Gold Mine Stopped Losing Emulsion to Groundwater | MTi GROUP
Project Highlights
  • Zero emulsion slumping or drippage in lined holes
  • Holes charged in a single pass — no reloads
  • Solution adopted in all areas with significant water flows
Site Profile
Location Ghana
Site Type Underground
Material Gold
Bench Height 26.0 m
Explosive Emulsion
Product BLASTSHIELD™ PLUS
Run a trial

Get these results on your bench.

Tell us about your operation — bench height, hole diameter, current powder factor. We'll ship samples, send a blaster to your site, or build a custom trial plan with your D&B team.

Same-week response
No charge for samples
Field engineer on call
Or call sales — (606) 663-4069 • Stanton, KY warehouse